Read only. This contract cannot be downloaded here. When your application is selected and the price is agreed, Solar ESS fills in your details and the job, and sends you the contract to sign.
Contract No. SESS-HC-__ · Job ref. _ · Made at Solar ESS Co. Ltd., Chiang Rai, on _ / _ / 20_
1. Parties
This hire-of-work contract is made between the Employer and the Contractor below. The Contractor works as an independent contractor, not as an employee of Solar ESS.
1.1 Employer
| Item | Details |
|---|---|
| Company | Solar ESS Co. Ltd. (บริษัท โซลาร์ เอสส์ จำกัด) |
| Tax ID | 0575566002051 |
| Address | 53 Moo 2 Tambon Nanglae, Amphoe Muang, Chiang Rai 57100 |
| Represented by | Mr Krisda Dhiradityakul, Chief Executive Officer |
| Phone | 063 151 6694, 089 632 5829 |
1.2 Contractor
| Item | Details |
|---|---|
| Name and last name | |
| Thai ID card / passport no. | |
| Address | |
| Phone / LINE ID | |
| Company name (optional) | |
| Company registration no. (optional) | |
| Tax ID (if different from ID card no.) | |
| TSIA member no. / Solar ESS test certificate no. |
A copy of the Contractor's ID card (and company registration, if any), signed as a true copy, is attached as Annex D.
2. Job description, responsibility and accountability
The Contractor will carry out the job below to the Solar ESS standard, for the price in Clause 3, and is accountable for the work, the team and the site until handover.
2.1 The job
| Item | Details |
|---|---|
| Job title (as on www.solaress.org/job) | |
| Site (approximate location) | |
| Scope of work | As in the job post and the Contractor's accepted proposal (Annex A) |
| Drawings / manuals to follow | |
| Start date | |
| Completion date | |
| Working days on site | |
| Materials supplied by | Solar ESS / Contractor / shared (list in Annex A) |
2.2 Responsibilities of the Contractor
- Do the work exactly to the scope, drawings and manuals in Annex A and the Solar ESS installation standards in Annex B. Any change needs written approval from Solar ESS first.
- Use the premium materials agreed (copper cable, IMC/EMT conduit, correctly matched breakers and cables). Materials supplied by Solar ESS are used only for this job; leftovers are returned.
- Have the electrical work done or supervised by a qualified, certified electrician, and work at height only by workers trained for it.
- Provide competent workers, tools, PPE (helmet, harness, gloves, safety shoes) and transport for the team. Follow Thai occupational safety law and site rules.
- Send daily progress photos to Solar ESS, and at handover the job report form (Annex C) with before/after photos and measurements.
- Keep the site clean and safe, protect the customer's property, and remove all waste at the end of each day.
- Arrive on time; tell Solar ESS at once of any delay, accident, damage or site problem.
2.3 Accountability
- The Contractor is responsible for its own workers, their wages, social security and accident insurance, and for their conduct on site.
- The Contractor is liable for loss or damage it or its team causes to the works, materials, the customer's property or third parties. Solar ESS's Contractor All Risk (CAR) insurance covers the works themselves; any deductible caused by the Contractor's fault is charged to the Contractor.
- The Contractor may not subcontract or hand over this job to anyone else without written approval from Solar ESS.
- Non-circumvention: the customer is Solar ESS's customer. The Contractor will not quote, sell, or take any work directly from this customer for 12 months after handover, except through Solar ESS.
- Confidentiality and personal data: customer details, prices and drawings are confidential and used only for this job, in line with the Personal Data Protection Act B.E. 2562.
- Work is accepted only when Solar ESS has checked it against the scope and the customer has completed the feedback form (Annex C) with no open issue.
3. Contract price and payment
Solar ESS pays the fixed price below after the work is accepted (Clause 2.3.6), less withholding tax and the warranty retention.
| Item | Amount (THB) |
|---|---|
| Contract price (labour only / labour and materials, as accepted) | |
| Advance for materials, if agreed (max. 30%, against receipts) | |
| Withholding tax 3% (Revenue Code, for services) | |
| Warranty retention 5% (released under Clause 5.4) | |
| Balance paid at acceptance |
- The price is fixed and covers all labour, tools, travel, lodging and the Contractor's own materials. Extra work is paid only if Solar ESS approves it in writing before it is done.
- Solar ESS pays the balance by bank transfer within 7 days after acceptance. If Solar ESS pays late without cause, it adds 0.1% of the late amount per day.
- The Contractor issues a receipt or tax invoice for each payment. Solar ESS issues the withholding tax certificate.
4. Breach of contract: compensation and remedies
If either party breaks this contract, the other may claim the compensation below; the Contractor's total penalties are capped at the contract price, except for wilful damage, theft or fraud.
| Breach | Compensation or remedy |
|---|---|
| Late completion without a cause accepted by Solar ESS | 0.1% of the contract price per day late, up to 10%; after 10 days Solar ESS may end the contract |
| Defective or non-standard work | Contractor fixes it at its own cost within 7 days of notice; if not, Solar ESS has it fixed by others and deducts the full cost |
| Abandoning the job | Unpaid amounts are forfeited; Contractor pays the extra cost of finishing the job with another team |
| Damage to works, materials or customer property | Contractor repairs or pays the actual cost (or the CAR deductible, if insured) |
| Loss or misuse of Solar ESS materials | Contractor pays the replacement cost |
| Unsafe work after a written warning | Solar ESS may stop the work and end the contract; pay only for work accepted |
| Taking work directly from the customer (Clause 2.3.4) | 20% of the value of that work, or the actual loss, whichever is higher |
| Breach of confidentiality or personal data | Actual loss and legal costs |
| Late payment by Solar ESS (Clause 3.2) | 0.1% of the late amount per day |
- Solar ESS gives written notice (LINE message or email counts) and a fair time to fix the breach before ending the contract, except for safety, theft or fraud.
- Amounts owed by the Contractor may be deducted from any payment or from the retention.
- Neither party is liable for delay caused by force majeure (severe weather, natural disaster, government order), if the other party is told promptly.
5. Warranty and warranty cost
The Contractor warrants its workmanship for 12 months from acceptance and pays all costs of fixing workmanship defects in that time.
| Item | Who pays | Terms |
|---|---|---|
| Workmanship defects (loose terminals, wrong wiring, leaks at roof fixings, structure, conduit, labelling) | Contractor | Free of charge: labour, travel and replacement parts damaged by the defect |
| Equipment failure (panels, inverter, battery, breakers) not caused by installation | Manufacturer, through Solar ESS | Contractor helps with diagnosis and replacement at a labour rate agreed in writing |
| Damage caused by misuse, accidents, natural disaster or work by others | Customer / insurer | Not covered by this warranty |
- Response time: the Contractor answers a warranty call within 24 hours and is on site within 3 working days (urgent safety faults: within 24 hours where possible).
- Fix time: the defect is fixed within 7 days of the visit, or a date agreed in writing.
- If the Contractor does not respond or fix in time, Solar ESS fixes it with another team and deducts the cost from the retention or invoices the Contractor.
- Retention: the 5% retention is released 12 months after acceptance, less any warranty costs, within 7 days of the end of the warranty.
6. General terms
This contract, with its annexes, is the whole agreement; Thai law applies.
- Disputes: the parties first try to settle by talking in good faith for 30 days. If they cannot agree, the case goes to the competent court in Chiang Rai.
- Changes: any change to this contract is valid only in writing, signed by both parties.
- Communication: instructions and notices are sent by LINE or email to the contacts in Clause 1 and count as written notice.
- Stamp duty: this contract carries stamp duty of 1 baht per 1,000 baht of the contract price (Revenue Code), paid by the Contractor unless agreed otherwise.
- Copies: made in two identical copies; each party keeps one.
Annexes
- Annex A: job post, drawings/manuals and the Contractor's accepted proposal and quotation
- Annex B: Solar ESS installation standards
- Annex C: job report form and customer feedback form
- Annex D: copy of the Contractor's ID card (and company registration, if any)
7. Signatures
Both parties have read and understood this contract and sign it below as their free agreement.
| Employer | Contractor |
|---|---|
| Signature: ____ | Signature: ____ |
| Mr Krisda Dhiradityakul | Name: ____ |
| Chief Executive Officer, Solar ESS Co. Ltd. (company seal) | Company (if any): ________ |
| Date: _ / _ / 20____ | Date: _ / _ / 20____ |
| Witness: ____ | Witness: ____ |
| Ms Artitaya Khuanphet | Name: ____ |
| Date: _ / _ / 20____ | Date: _ / _ / 20____ |