1) Akao Cafe & Homestay, Chiang Rai: phase 2 · Off-grid
- System: 16 kW off-grid solar with 48 kWh of battery storage (3 × IntelliHome 16 kWh batteries).
- What it powers: the new building: four guest houses, a staff room, storage and a dedicated battery room. It runs as its own system, separate from the café's existing solar.
- Why off-grid: the guest houses get clean power day and night, with no grid connection and no monthly electricity bill.
- Where and when: Mae Suai Dam area, Mae Suai, Chiang Rai. Work started in November 2026.
2) M-Harmony Resort, Mae Khao Tom, Chiang Rai · Off-grid, three-phase
- System: 50 kW three-phase hybrid inverter with 60 kWh high-voltage FlexCore battery storage, built to grow to about 100 kWh as guest numbers rise.
- Panels: 45 × 650 W high-efficiency panels (about 29 kWp) on a galvanised steel ground mount set on screw piles: quick to build, no large concrete pours.
- Back-up: a generator connected through an automatic transfer switch for long cloudy spells.
- Where and when: Mae Khao Tom, Mueang Chiang Rai. Target: running by early December 2026.
3) Starbucks @ My Park, Chonburi · Commercial on-grid
- System: 30 kW Huawei on-grid inverter with 48 × 670 W rooftop panels (about 32 kWp).
- Our scope: installation, testing and commissioning under an EPC contract.
- When: installation 11–24 November 2026 (14 days).
- Insured: covered from the first day on site by our Contractor All Risk (CAR) insurance. More about this project →